Splits, ducted systems, VRF, ductwork and service — practical guides for Tashkent and Uzbekistan.
41 41
Usually not a “bad brand” — piping, vacuum and commissioning. What to check before replacing the outdoor unit.
Read →
Before the tender: when a few outdoor units are enough and when you need a multizone plant.
Read →
A burst coil is a typical winter AHU failure. What must trip before the metal splits.
Read →
Open docks dump heat and pull dust. A curtain is a cut-off jet, not decoration.
Read →
The usual ventilation-quote debate: water is cheaper to run, electric is simpler with no hot-water plant.
Read →
Not a fan-in-a-box: airflow, filtration and tempering for your site — or you pay in noise and kW.
Read →
Numbers and reports — not “it feels like it blows”. What we measure before handover.
Read →
A car park is not a warehouse: exhaust gases, low soffits and a fire mode. How a working scheme is built.
Read →
Not extra exhaust — a life-safety system. Without it many buildings will not pass handover.
Read →
Why one big roof fan fails goods and staff — and how to layout supply and exhaust properly.
Read →
Design, ducts, AHU, balancing — and where vague “from …” prices grow on site.
Read →
From diversity calc to controller programming — what you must not skip.
Read →
Without a design, industrial and central cooling almost always grows through rework.
Read →
Same method — calc and balance — different accents by building type.
Read →
Concealed comfort stays quiet only if ducts and grilles are planned before finishes.
Read →
What the shop needs to ship on time — and how to keep the install crew moving.
Read →
Where extra heat in a workshop comes from and why load calculation beats guesswork.
Read →
Why a mall needs central air-handling with cooling and filtration — not just exhaust fans.
Read →
Two common multi-zone HVAC approaches — how they differ and which fits your tower.
Read →
When a rooftop package is enough and when you need a central air-handling plant with ductwork.
Read →
Why a window fan fails in summer open-plan offices and how to cool fresh air properly.
Read →
How medical HVAC differs from offices and what you must not cut during a fit-out.
Read →
Where to start when “something blows but nobody knows what” — without shutting the plant for weeks.
Read →
When heat recovery really cuts cooling and heating load — and when it is unnecessary complexity.
Read →
Capture dust at the machine — don’t just stir it around the hall with general exhaust.
Read →
Why guessing by floor area fails in a plant and what data engineers need for a proper design.
Read →
From fan rattle to bad brackets — common noise sources.
Read →
Weak cooling, icing and oily joints usually mean a leak.
Read →
Air balance so guests avoid smoke and stuffiness.
Read →
What makes up installation cost and how to avoid overpaying.
Read →
Five practical steps without losing comfort at +40°C.
Read →
Checklist: capacity, inverter, noise and outdoor mounting.
Read →
Engineer checklist before fit-out.
Read →
When a ducted system justifies ceiling height and budget.
Read →
How VRF differs from many wall splits.
Read →
Why an in-house shop matters for timelines and fit.
Read →
A clear work order that avoids rework.
Read →
Why plant climate is not a wall split job.
Read →
When a column unit beats a cassette or wall split.
Read →
What to do before +40°C so the unit does not fail at peak.
Read →
How to keep supply air comfortable in the heating season.
Read →